Summary- HV Substation Augmentation

Supply and Installation of 1x new Eaton RMU. This RMU was to be installed tested and commissioned in a way that enabled a gradual transition from the existing RMU. Once cut over the existing RMU was to be removed. As part of this job HES had to complete civil works, the installation of support and containment systems as well as the supply, install, termination and commissioning of HV Cables, including interlink cables form the existing RMU to the new. This installation and the required earthing upgrades was completed on-time, on-budget and to all relevant standards including but not limited to AS2067.